Accessibility Statement Skip Navigation
  • Resources
  • Investor Relations
  • Journalists
  • +44 (0)20 7454 5110
  • Client Login
  • Send a Release
Return to PR Newswire homepage
  • News
  • Products
  • Contact
Search
When typing in this field, a list of search results will appear and be automatically updated as you type.

Searching for your content...

No results found. Please change your search terms and try again.

News Releases

view all
    • News in Focus
        • Browse News Releases

        • All Public Company News
        • All Multimedia News
        • View All News Releases

        • Regulatory News

        • D/A/CH Regulatory News
        • UK Regulatory News
        • View All Regulatory News

    • Business & Money
        • Auto & Transportation

        • Aerospace & Defense
        • Air Freight
        • Airlines & Aviation
        • Automotive
        • Maritime & Shipbuilding
        • Railroads & Intermodal Transportation
        • Supply Chain/Logistics
        • Transportation, Trucking & Railroad
        • Travel
        • Trucking & Road Transportation
        • View All Auto & Transportation

        • Business Technology

        • Blockchain
        • Broadcast Tech
        • Computer & Electronics
        • Computer Hardware
        • Computer Software
        • Data Analytics
        • Electronic Commerce
        • Electronic Components
        • Electronic Design Automation
        • Financial Technology
        • High Tech Security
        • Internet Technology
        • Nanotechnology
        • Networks
        • Peripherals
        • Semiconductors
        • View All Business Technology

        • Entertain­ment & Media

        • Advertising
        • Art
        • Books
        • Entertainment
        • Film & Motion Picture
        • Magazines
        • Music
        • Publishing & Information Services
        • Radio & Podcast
        • Television
        • View All Entertain­ment & Media

        • Financial Services & Investing

        • Accounting News & Issues
        • Acquisitions, Mergers & Takeovers
        • Banking & Financial Services
        • Bankruptcy
        • Bond & Stock Ratings
        • Conference Call Announcements
        • Contracts
        • Cryptocurrency
        • Dividends
        • Earnings
        • Earnings Forecasts & Projections
        • Financing Agreements
        • Insurance
        • Investments Opinions
        • Joint Ventures
        • Mutual Funds
        • Private Placement
        • Real Estate
        • Restructuring & Recapitalisation
        • Sales Reports
        • Shareholder Activism
        • Shareholder Meetings
        • Stock Offering
        • Stock Split
        • Venture Capital
        • View All Financial Services & Investing

        • General Business

        • Awards
        • Commercial Real Estate
        • Corporate Expansion
        • Earnings
        • Environmental, Social and Governance (ESG)
        • Human Resource & Workforce Management
        • Licensing
        • New Products & Services
        • Obituaries
        • Outsourcing Businesses
        • Overseas Real Estate (non-US)
        • Personnel Announcements
        • Real Estate Transactions
        • Residential Real Estate
        • Small Business Services
        • Socially Responsible Investing
        • Surveys, Polls & Research
        • Trade Show News
        • View All General Business

    • Science & Tech
        • Consumer Technology

        • Artificial Intelligence
        • Blockchain
        • Cloud Computing/Internet of Things
        • Computer Electronics
        • Computer Hardware
        • Computer Software
        • Consumer Electronics
        • Cryptocurrency
        • Data Analytics
        • Electronic Commerce
        • Electronic Gaming
        • Financial Technology
        • Mobile Entertainment
        • Multimedia & Internet
        • Peripherals
        • Social Media
        • STEM (Science, Tech, Engineering, Math)
        • Supply Chain/Logistics
        • Wireless Communications
        • View All Consumer Technology

        • Energy & Natural Resources

        • Alternative Energies
        • Chemical
        • Electrical Utilities
        • Gas
        • General Manufacturing
        • Mining
        • Mining & Metals
        • Oil & Energy
        • Oil & Gas Discoveries
        • Utilities
        • Water Utilities
        • View All Energy & Natural Resources

        • Environ­ment

        • Conservation & Recycling
        • Environmental Issues
        • Environmental Policy
        • Environmental Products & Services
        • Green Technology
        • Natural Disasters
        • View All Environ­ment

        • Heavy Industry & Manufacturing

        • Aerospace & Defence
        • Agriculture
        • Chemical
        • Construction & Building
        • General Manufacturing
        • HVAC (Heating, Ventilation & Air-Conditioning)
        • Machinery
        • Machine Tools, Metalworking & Metallurgy
        • Mining
        • Mining & Metals
        • Paper, Forest Products & Containers
        • Precious Metals
        • Textiles
        • Tobacco
        • View All Heavy Industry & Manufacturing

        • Telecomm­unications

        • Carriers & Services
        • Mobile Entertainment
        • Networks
        • Peripherals
        • Telecommunications Equipment
        • Telecommunications Industry
        • VoIP (Voice over Internet Protocol)
        • Wireless Communications
        • View All Telecomm­unications

    • Lifestyle & Health
        • Consumer Products & Retail

        • Animals & Pets
        • Beers, Wines & Spirits
        • Beverages
        • Bridal Services
        • Cannabis
        • Cosmetics & Personal Care
        • Fashion
        • Food & Beverages
        • Furniture & Furnishings
        • Home Improvement
        • Household, Consumer & Cosmetics
        • Household Products
        • Jewellery
        • Non-Alcoholic Beverages
        • Office Products
        • Organic Food
        • Product Recalls
        • Restaurants
        • Retail
        • Supermarkets
        • Toys
        • View All Consumer Products & Retail

        • Entertain­ment & Media

        • Advertising
        • Art
        • Books
        • Entertainment
        • Film & Motion Picture
        • Magazines
        • Music
        • Publishing & Information Services
        • Radio & Podcast
        • Television
        • View All Entertain­ment & Media

        • Health

        • Biometrics
        • Biotechnology
        • Clinical Trials & Medical Discoveries
        • Dentistry
        • FDA Approval
        • Fitness/Wellness
        • Health Care & Hospitals
        • Health Insurance
        • Infection Control
        • International Medical Approval
        • Medical Equipment
        • Medical Pharmaceuticals
        • Mental Health
        • Pharmaceuticals
        • Supplementary Medicine
        • View All Health

        • Sports

        • General Sports
        • Outdoors, Camping & Hiking
        • Sporting Events
        • Sports Equipment & Accessories
        • View All Sports

        • Travel

        • Amusement Parks & Tourist Attractions
        • Gambling & Casinos
        • Hotels & Resorts
        • Leisure & Tourism
        • Outdoors, Camping & Hiking
        • Passenger Aviation
        • Travel Industry
        • View All Travel

    • Policy & Public Interest
        • Policy & Public Interest

        • Animal Welfare
        • Corporate Social Responsibility
        • Economic News, Trends & Analysis
        • Education
        • Environmental
        • European Government
        • Labour & Union
        • Natural Disasters
        • Not For Profit
        • Public Safety
        • View All Policy & Public Interest

    • People & Culture
        • People & Culture

        • Aboriginal, First Nations & Native American
        • African American
        • Asian American
        • Children
        • Diversity, Equity & Inclusion
        • Hispanic
        • Lesbian, Gay & Bisexual
        • Men's Interest
        • People with Disabilities
        • Religion
        • Senior Citizens
        • Veterans
        • Women
        • View All People & Culture

    • Explore Our Platform
    • Plan Campaigns
    • Create with AI
    • Distribute Press Releases
    • Report Results
    • Amplify Content
    • All Products
    • General Enquiries
    • Media Enquiries
    • Partnerships
    • Hamburger menu
    • Cision PR Newswire UK provides press release distribution, targeting, monitoring, and marketing services
    • Send a Release
      • Phone

      • +44 (0)20 7454 5110 from 8 AM - 5:30 PM GMT

      • ALL CONTACT INFO
      • Contact Us

        +44 (0)20 7454 5110
        from 8 AM - 5:30 PM GMT

    • Searching for your content...

      No results found. Please change your search terms and try again.

      News Releases

      view all
      Close menu
    • News
    • Products
    • Contact
      • Client Login
      • Send a Release
      • Resources
      • Journalists
      • 2 News in Focus
      • 5 Business & Money
      • 5 Science & Tech
      • 5 Lifestyle & Health
      • 1 Policy & Public Interest
      • 1 People & Culture
      • Client Login
      • Send a Release
      • Resources
      • Journalists
      • Explore Our Platform
      • Plan Campaigns
      • Create with AI
      • Distribute Press Releases
      • Report Results
      • Amplify Content
      • All Products
      • Client Login
      • Send a Release
      • Resources
      • Journalists
      • General Enquiries
      • Media Enquiries
      • Partnerships
      • Client Login
      • Send a Release
      • Resources
      • Journalists
      Close submenu (News in Focus) News in Focus
      • Browse News Releases
      • Regulatory News
      Close submenu (Business & Money) Business & Money
      • Auto & Transportation
      • Business Technology
      • Entertain­ment & Media
      • Financial Services & Investing
      • General Business
      Close submenu (Science & Tech) Science & Tech
      • Consumer Technology
      • Energy & Natural Resources
      • Environ­ment
      • Heavy Industry & Manufacturing
      • Telecomm­unications
      Close submenu (Lifestyle & Health) Lifestyle & Health
      • Consumer Products & Retail
      • Entertain­ment & Media
      • Health
      • Sports
      • Travel
      Close submenu (Policy & Public Interest) Policy & Public Interest
      • Policy & Public Interest
      Close submenu (People & Culture) People & Culture
      • People & Culture

      LUCARA ANNOUNCES Q3 2026 RESULTS


      News provided by

      Lucara Diamond Corp.

      13 Nov, 2026, 23:23 GMT

      Share this article

      Share this article


      VANCOUVER, BC, Nov. 13, 2026 /PRNewswire/ -- (TSX: LUC) (BSE: LUC) (Nasdaq FNGM: LUC) PDF Version

      Lucara Diamond Corp. ("Lucara" or the "Company") today reports its results for the quarter ended September 30, 2026. All amounts are in U.S. dollars unless otherwise noted. 

      Q3 2026 HIGHLIGHTS

      Sales and Financial Results:

      • Revenue was $61.1 million (Q3 2025: $51.2 million) from the sale of 113,227 carats, including the sale of the 1,303 carat Type IIa diamond.
      • Adjusted operating earnings1 were $32.8 million (Q3 2025: $29.2 million). Net income was $6.6 million (Q3 2025: $7.4 million).

      Revenue Guidance:

      • The Company increased its 2026 revenue guidance to $140 to $160 million from the previous range of $100 to $130 million, reflecting the contribution from the sale of the Motswedi and 1,303 carat Type IIa diamonds. The recovery of these diamonds continues to underscore the outstanding quality of the Karowe orebody. 

      Operations:

      • Karowe processed 829,822 tonnes of ore in Q3 2026 at an average grade of 11.3 carats per hundred tonnes. Q3 2026 covered 97 days (June 26 to September 30) following the transition to calendar-month reporting, compared to 92 days in Q2 2026. On an average daily basis, throughput was the highest in the last five quarters.
      • 94,067 carats were recovered from direct ore feed, plus a further 2,700 carats from processing of historical recovery tailings, for a total of 96,767 carats (Q3 2025: 97,651). 163 Specials2 were recovered from direct ore feed (Q3 2025: 224), including the 1,303 carat Type IIa diamond, a 316 carat diamond and a further seven diamonds between 100 and 200 carats.
      • Operating cost per tonne processed3 guidance for the year is revised to $24.00 to $26.00 from $27.50 to $31.00. Quarterly operating costs per tonne processed decreased to $22.41 (Q3 2025: $25.65), below the revised guidance, due to higher throughput and lower in-pit mining activity, which offset increased power costs.

      Karowe Underground Project:

      • The Karowe Underground Project ("UGP") transitioned from shaft construction to underground lateral development during the quarter.
      • The production shaft was handed over to the owner's team in August, and development waste hoisting commenced following the Botswana Department of Mines licensing of the rock winder.
      • Group R Mining ("Group R") commenced underground lateral development, advancing 466 metres ("m") during the quarter.
      • UGP capital expenditures were $40.7 million in Q3 2026. Remaining costs to complete, including contingency, were $245.2 million at September 30, 2026.

      _________________________________

      1 Adjusted operating earnings is a non-IFRS measure. Refer to "Non-IFRS Financial Measures" of the Company's Q3 2026 MD&A for discussion.

      2 Specials are defined as stones above 10.8 carats.

      3 Operating cost per tonne processed refers to operating cost per tonne of ore processed, a non-IFRS measure. Refer to "Non-IFRS Financial Measures" of the Company's Q3 2026 MD&A for discussion.

      Liquidity:

      • Cash and cash equivalents were $232.6 million at September 30, 2026, including $66.2 million held in the Debt Service Retention Account ("DSRA") and a $10.0 million customer security deposit.
      • In September 2026, the Company's $350.0 million senior secured bonds (the "Bonds") were admitted to trading on Euronext ABM (Oslo Børs).

      Lucara Botswana management changes:

      • Effective November 30, 2026, Naseem Banu Lahri will conclude her tenure as Managing Director of Lucara Botswana Proprietary Limited ("Lucara Botswana"). Naseem will continue to support Lucara Botswana through the transition period until the end of Q1 2027.

      William Lamb, President & CEO commented: "On behalf of Lucara, I would like to thank Naseem for her contributions to Lucara Botswana and her commitment to stakeholder engagement, responsible mining, and the development of relationships with industry and local communities. We wish her all the best in her future endeavors.

      Lucara delivered strong results in the third quarter of 2026, highlighted by exceptional diamond recoveries and strong revenue performance, once again demonstrating the quality and value of the Karowe resource. These results, which have led in an increase in the Company's revenue guidance for 2026, reinforce Karowe's position as one of the world's most remarkable diamond mines and its continued ability to produce rare, high-value diamonds. Our strong operational performance reflects the dedication of our team at Karowe and our continued focus on safety, cost discipline, and operational efficiency, which remain critical to maintaining financial resilience and mitigating the impact of sustained weakness in certain sectors of the diamond market.

      As we enter the final months of 2026, we are pleased with our performance and the momentum across the business. We continue to make meaningful progress on the UGP, supported by our strengthened financial position following the successful completion of our financing strategy earlier this year. Our priorities remain firmly focused on maintaining operational excellence and advancing the safe and timely delivery of the UGP, positioning Lucara to continue recovering extraordinary diamonds and creating sustainable long-term value for our shareholders and stakeholders."

      KAROWE UNDERGROUND PROJECT UPDATE

      The UGP is designed to access the highest value portion of the Karowe orebody, with initial planned underground carat production predominantly from EM/PK(S)4. The UGP is expected to extend the mine life to 2038.

      On January 30, 2026, the Company announced an update to the UGP schedule and budget (link to news release). Full-scale production from the UGP is anticipated in H1 2028, with a total estimated cost at completion of $779.2 million (including contingency). As at September 30, 2026, remaining costs to complete the UGP, including contingency, were $245.2 million5. Remaining costs to complete reflect current exchange rates and the Company's latest estimates. Committed, not yet incurred, UGP costs were $92.9 million. See "Liquidity and UGP Funding" in the Company's Q3 2026 MD&A for further information on the funding of the UGP.

      _______________________________

      4 EM/PK(S): Eastern magmatic/pyroclastic kimberlite (south).

      5 Total estimated cost at completion and remaining costs to complete are presented on a cash basis and represent the expected cash outflows required to complete the UGP. UGP capital expenditures are presented on an accrual basis. The difference between the reduction in remaining costs to complete and UGP capital expenditures for the period reflects the timing of payments, including costs incurred but not yet paid at period end.

      Project Development
      During the quarter, the Company incurred $40.7 million6 in capital expenditures compared to $22.7 million in Q3 2025. Year-to-date capital expenditures totalled $81.8 million compared to $55.5 million in the comparable period of 2025. Expenditures were primarily directed toward shaft equipping, lateral development, including acquisition of the lateral development fleet, and surface infrastructure.

      Following completion of the production and ventilation shaft sinking in 2025, the project transitioned from shaft construction to underground development. In July 2026, the Botswana Department of Mines licensed the production shaft auxiliary winder and the man and material winder, enabling lateral development equipment to be deployed underground. In August 2026, the reconfigured production shaft rock winder was licensed, enabling development waste hoisting to begin, and the production shaft was handed over to the owner's team. The ventilation shaft was fully equipped in September 2026 and handed over to the owner's team.

      Group R began underground lateral development in August 2026. During the quarter, the primary lateral development fleet, including jumbo drill rigs and load-haul-dump units, and auxiliary equipment were slung down the production shaft to support lateral development. During the quarter, 466 m of lateral development was advanced on the 285, 310 and 335 levels, bringing project-to-date lateral development to 2,121 m. Development rates were slightly lower than planned due to Group R ramp up, the availability of the primary fleet, and by two water intersections encountered during probe drilling, both of which were sealed and grouted. Raiseboring of the 2.1 m diameter muck pass between the 470 and 285 levels was substantially completed in September 2026, well ahead of schedule. Following licensing of the rock winder in August 2026, waste hoisting through the production shaft commenced. In September 2026, 1,603 skips were hoisted, representing approximately 33,663 tonnes of development waste. Installation of the main surface ventilation fans was completed during the quarter with commissioning taking place in September 2026.

      The UGP has achieved 2,427 lost-time injury free days. The project-to-date Total Recordable Injury Frequency Rate ("TRIFR") was 0.60, below the project target of 0.90, with a 12-month rolling TRIFR of 0.64.

      Upcoming Project Development Milestones
      Key activities and milestones planned for Q4 2026 include:

      • Handover of the main surface ventilation fans to the owner's team.
      • Ramp-up of lateral development on the 285, 310, 335 and 470 levels.
      • Completion of the 470-level to 285-level muck pass.
      • Completion of auxiliary fleet slinging and continued delivery of the second phase of the lateral development fleet.
      • Commencement of mass excavation of the underground crusher and conveyor chambers, and continued procurement of structural steel and conveyor components.

      ___________________________

      6 Excludes qualifying borrowing costs capitalized.

      RESULTS OF OPERATIONS – KAROWE MINE



      YTD 2026

      Q3-26

      Q2-26

      Q1-26

      Q4-25

      Q3-25

      Sales








      Revenues

      $M

      123.9

      61.1

      41.0

      21.8

      34.5

      51.2

      Carats sold

      Carats

      251,524

      113,227

      58,553

      79,744

      101,842

      101,422









      Production








      Tonnes mined (ore)(4)

      Tonnes

      789,920

      391,626

      392,695

      5,599

      312,148

      517,155

      Tonnes mined (waste)

      Tonnes

      -

      -

      -

      -

      -

      5,682

      Tonnes processed

      Tonnes

      2,310,074

      829,822

      761,848

      718,404

      705,513

      744,753

      Average grade processed(1)

      cpht(*)

      10.8

      11.3

      10.9

      10.0

      12.2

      12.8

      Carats recovered

      Carats

      249,237

      94,067

      83,109

      72,061

      86,110

      95,302









      Costs








      Operating cost per tonne processed(2)

      $

      23.55

      22.41

      23.76

      24.74

      32.88

      25.65









      Capital Expenditures








      Sustaining

      $M

      7.2

      2.4

      2.9

      1.9

      4.8

      3.0

      UGP(3)

      $M

      81.8

      40.7

      22.1

      19.0

      20.3

      22.7

      (*)

      Carats per hundred tonnes

      (1)

      Average grade processed is from direct processing carats and excludes carats recovered from re-processing historical recovery tailings.

      (2)

      Operating cost per tonne processed is a non-IFRS measure. Refer to "Non-IFRS Financial Measures" of the Company's Q3 MD&A.

      (3)

      Excludes qualifying borrowing costs capitalized.

      (4)

      Q1 2026 tonnes mined (ore) have been revised to 5,599 tonnes (previously reported: 6,231 tonnes) to reflect an updated rock density assumption in the resource model.

      DIAMOND MARKET

      Global natural diamond production is forecast to drop below 100 million carats in 2026, down from over 150 million carats less than a decade ago, reflecting the depletion of legacy mines, limited new discoveries, and the suspension or closure of several mines industry-wide. Synthetic diamond wholesale and retail prices have continued to decline through 2026, consistent with continued growth in production capacity.

      In the near term, the natural diamond market is showing signs of a price recovery in certain size categories. Larger, rarer and higher-value goods have shown stronger price performance, supported by constrained supply and resilient demand, while smaller commercial categories continue to face pricing pressure from macroeconomic uncertainty and lab-grown substitution. Tightening natural diamond supply and emerging price momentum in larger categories support a more positive outlook for the remainder of 2026.

      QUARTERLY SALES BY SALES CHANNEL


      Three months ended September 30,


      Nine months ended September 30,

      In millions of U.S. dollars

      2026

      2025


      2026

      2025

      Sales Channel






      HB

      $      48.5

      $      38.0


      $       96.0

      $       91.3

      Tender

      11.2

      11.2


      23.9

      28.3

      Clara

      1.4

      2.0


      4.1

      5.6

      Total Revenue(1) 

      $     61.1

      $      51.2


      $       123.9

      $       125.2

      (1)

      Figures may not add due to rounding.

      Diamonds from Karowe are sold through three sales channels: through a diamond sales agreement with HB Trading BV ("HB"), through quarterly tenders, and on the Clara Diamond Solutions ("Clara") sales platform. 

      For the three months ended September 30, 2026, revenue increased 19% to $61.1 million, compared to $51.2 million in Q3 2025, primarily driven by the sale of the 1,303 carat Type IIa diamond. Revenue from HB was $48.5 million, or 79% of total revenue (Q3 2025: $38.0 million, 74%). Carats sold increased 12% to 113,227 carats. Tender revenue was $11.2 million, in line with Q3 2025, as an 11% decrease in the average price per carat offset higher volume of carats. Clara revenue was $1.4 million (Q3 2025: $2.0 million), largely reflecting a 26% decrease in the average sales price per carat. The lower average price reflects a greater proportion of smaller and lower-quality diamonds from run-of-mine stockpile material and continued price pressure in smaller diamond categories.

      HB revenue includes "top-up" and "top-down" payments, which are received by the Company or made to HB when the final polished diamond sales price differs from the agreed initial polished value. Given the time required to fully monetize a stone through this process, top-up and top-down payments can introduce variability into HB revenue on a quarter-to-quarter basis.

      The Company has given notice to terminate its agreement with Clara. Beginning in Q1 2027, the diamonds previously sold on Clara will be sold through the Company's regular tender process.

      2026 OUTLOOK

      This section of the news release provides management's production and cost estimates for 2026. These are forward-looking statements and are subject to the cautionary note regarding the risks associated with such statements.

      Karowe Diamond Mine

      2026

      2026


      In millions of U.S. dollars unless otherwise noted

      Original Guidance

      Revised Guidance


      Diamond revenue (millions)

      $100 to $130

      $140 to $160


      Diamond sales (thousands of carats)

      340 to 360

      340 to 360


      Diamonds recovered (thousands of carats)

      340 to 360

      340 to 360


      Ore tonnes mined (millions)

      Up to 0.6

      Up to 0.9


      Waste tonnes mined (millions)

      Up to 0.2 

      Up to 0.2


      Ore tonnes processed (millions)

      2.6 to 2.9

      2.8 to 3.0


      Operating cost per tonne of ore processed(1) 

      $27.50 to $31.00

      $24.00 to $26.00


      UGP capital expenditure

      Up to $110 million

      Up to $110 million


      Sustaining capital expenditure

      Up to $11.5 million

      Up to $11.5 million


      Average exchange rate – Botswana Pula per United States Dollar

      14.0

      14.0


      (1) Operating costs per tonne of ore processed is a non-IFRS measure. See "Non-IFRS Financial Measures".

      Revenue guidance for 2026 has been increased to $140 to $160 million from the original guidance of $100 to $130 million, reflecting Legacy Stones7 sales including the Motswedi and 1,303 carat Type IIa diamond. Ore tonnes mined guidance has also been increased, reflecting higher ore tonnes mined from the open pit ahead of the conclusion of open pit mining in Q4 2026. Ore tonnes processed guidance has been increased to 2.8 to 3.0 million tonnes, reflecting higher than planned plant throughput, supported by the processing of weathered stockpile material. Operating cost per tonne of ore processed guidance has been reduced to $24.00 to $26.00, reflecting higher throughput. All other guidance remains unchanged.

      The 2026 outlook reflects the natural variability in the resource, including variations in recovered grade and diamond quality, which may influence revenue. The assumptions for carats recovered and sold as well as tonnes of ore processed are consistent with achieved plant performance in recent years. Run-of-mine stockpiled material (North, Centre, South Lobe) and life-of-mine stockpiles are expected to provide mill feed through 2027 when UGP development ore is scheduled to supplement stockpile feed with high-grade EM/PK(S). Full scale underground production is planned for H1 2028.

      _________________________________

      7 Legacy Stones refer to rough stones that may be sold for a value greater than $10.0 million.

      UGP capital expenditures are expected to be up to $110.0 million in 2026 with remaining expenditures focused on lateral development and the materials handling system. Sustaining capital expenditure is expected to be up to $11.5 million primarily directed to the replacement and refurbishment of key asset components and tailings storage facility advancement.  

      RESULTS CALL

      The Company will host a conference call and webcast to discuss the results on Monday, November 16, 2026 at 6:00 a.m. Pacific Time (British Columbia). Conference call and webcast details:

      Listen only webcast: LINK

      Dial in for investor and analyst Q&A: LINK

      To participate in the call, click on the dial link above and complete the online registration form. Once registered you will receive the dial-in information and a unique PIN the join the call and ask questions.

      On behalf of the Board,

      William Lamb

      President and Chief Executive Officer

      Follow Lucara Diamond on Facebook, Instagram and LinkedIn

      ABOUT LUCARA

      Lucara is a leading independent producer of large exceptional quality Type IIa diamonds from its 100% owned Karowe Diamond Mine in Botswana. Karowe is the only diamond mine in the world to have recovered ten diamonds in excess of 1,000 carats in weight. The Karowe Mine has been in production since 2012 and is the focus of the Company's operations and development activities. Karowe is transitioning from open pit to underground mining with the development of the UGP, which is designed to access the highest value portion of the Karowe orebody.

      The information in this release is subject to the disclosure requirements of Lucara pursuant to the EU Market Abuse Regulation. The Company's certified adviser on the Nasdaq First North Growth Market is Bergs Securities AB, ca@bergssecurities.se, +46 739 49 62 50. This information was submitted for publication, through the agency of the contact person set out above, on November 13, 2026, at 3:45 p.m. Pacific Time (British Columbia).

      CAUTIONARY NOTE REGARDING FORWARD LOOKING STATEMENTS

      Certain statements made in this news release contain "forward-looking information" and "forward-looking statements" as defined in applicable securities laws. Generally, any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance and often (but not always) using forward-looking terminology such as "expects", "is expected", "anticipates", "believes", "plans", "projects", "estimates", "budgets", "scheduled", "forecasts", "assumes", "intends", "strategy", "goals", "objectives", "potential", "possible" or variations thereof or stating that certain actions, events, conditions or results "may", "could", "would", "should", "might" or "will" be taken, occur or be achieved, or the negative of any of these terms and similar expressions) are not statements of historical fact and may be forward-looking statements.

      Forward-looking information and forward-looking statements may include, but are not limited to, information or statements with respect to the project schedule and capital costs for the UGP, diamond sales projections and outlook disclosure under "2026 Outlook", the Company's ability to meet its obligations under the Bond terms, future price stability, supply and demand of rough or polished diamonds, estimated capital costs, the focus of future expenditures, future forecasts of revenue and variable consideration in determining revenue, the outcome of tax assessments and the likelihood of recoverability of tax payments made, activities planned for the UGP, including to advance lateral development, and continue operational readiness, estimation of mineral resources including the determination of the boundary between South Lobe M/PK(S) and EM/PK(S) domains due to the significant grade difference between these two domains, cost and timing of the development of deposits and estimated future production, currency exchange rates, rates of inflation, requirements for and availability of additional capital, capital expenditures, operating costs, production and cost estimates, tax rates, timing of drill programs, government regulation of operations, environmental risks and compliance obligations, limitations on insurance coverage, and geopolitical and economic risks affecting the Company's operational viability including sanctions, trade restrictions and tariffs, the impact of the growing supply of laboratory grown diamonds on the demand for and pricing of the Company's natural diamond production, and the risk that continued expansion in laboratory grown diamond production and shifts in consumer preferences could further adversely impact revenues achievable by the Company, the ability of HB to perform its obligations, including making timely payments to the Company, and the concentration of credit risk associated with HB representing a significant proportion of the Company's total revenue, that carat production and revenues from the processing of run-of-mine ore stockpiles will be sufficient to support the Company's operations and liquidity requirements during the period prior to the achievement of commercial production from the UGP, and the ability of key contractors, including the lateral development contractor, to perform their obligations under their respective agreements in the manner and timeframe contracted for, and the risk that any failure or delay in contractor performance could result in material delays to the UGP and increased project costs.

      While these factors and assumptions are considered reasonable by the Company as at the date of this news release in light of management's experience and perception of current conditions and expected developments, these statements are inherently subject to significant business, economic and competitive uncertainties and contingencies. Known and unknown factors could cause actual results to differ materially from those projected in the forward-looking information and undue reliance should not be placed on such information. Such factors include, but are not limited to: the timing, scope and cost of additional grouting events at the UGP, the Company's ability to comply with the terms and covenants of the Bonds, the consequences of any defaults under the Bonds including the potential enforcement of security granted to bondholders over the assets of the Company and its subsidiaries, that expected cash flow from operations, combined with external financing will be sufficient to complete construction of the UGP, credit risk, price risk, that the estimated timelines to achieve mine ramp up and full production from the UGP can be achieved, that sufficient run-of-mine stockpiled ore of sufficient grade and value will be available to generate revenue prior to the achievement of commercial production from the UGP, the economic potential of a mineralized area, the size and tonnage of a mineralized area, anticipated sample grades or bulk sample diamond content, expectations that the UGP will extend mine life, forecasts of additional revenues, future production activity, that depletion and amortization expense on assets will be affected by both the volume of carats recovered in any given period and the reserves that are expected to be recovered, the future price and demand for, and supply of, diamonds, expectations regarding the scheduling of activities for the UGP.

      Forward-looking information and statements are based on the opinions and estimates of management as of the date such statements are made, and they are subject to several known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievement expressed or implied by such forward-looking statements due to a variety of risks, uncertainties, and other factors, including, without limitation, those referred to in this news release. The foregoing is not exhaustive of the factors that may affect any of our forward-looking statements. The Company believes that expectations reflected in this forward-looking information are reasonable, but no assurance can be given that these expectations will prove to be correct. Certain risks which could impact the Company are discussed under the heading "Risks and Uncertainties" in the Company's most recent MD&A and in the Company's most recent AIF available at SEDAR+ at www.sedarplus.ca.

      Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. Accordingly, readers and investors should not place undue reliance on forward-looking statements. Forward-looking information and statements contained in this news release are made as of the date of this news release and accordingly are subject to change after such date. Except as required by law, the Company disclaims any obligation to revise any forward-looking information and statements to reflect events or circumstances after the date of such information and statements. All forward-looking information and statements contained or incorporated by reference in this news release are qualified by the foregoing cautionary statements.

      Modal title

      Also from this source

      LUCARA ANNOUNCES THAT EURONEXT OSLO BØRS HAS ADMITTED ITS US$350.0 MILLION SENIOR SECURED BONDS TO REGISTRATION ON EURONEXT ABM

      (TSX: LUC), (BSE: LUC), (Nasdaq FNGM: LUC) PDF Version Lucara Diamond Corp. ("Lucara" or the "Company") announces that Euronext Oslo Børs has...

      LUCARA ANNOUNCES Q2 2026 RESULTS

      (TSX: LUC) (BSE: LUC) (Nasdaq FNGM: LUC) PDF Version Lucara Diamond Corp. ("Lucara" or the "Company") today reports its results for the quarter ended ...

      More Releases From This Source

      Explore

      Mining & Metals

      Mining & Metals

      Precious Metals

      Precious Metals

      Mining

      Mining

      Earnings

      Earnings

      News Releases in Similar Topics

      Contact PR Newswire

      • +44 (0)20 7454 5110
        from 8 AM - 5:30 PM GMT
      • General Enquiries
      • Media Enquiries
      • Partnerships

      Products

      • Explore Our Platform
      • Plan Campaigns
      • Create with AI
      • Distribute Press Releases
      • Report Results
      • Amplify Content

      About

      • About PR Newswire
      • About Cision
      • Careers
      • Accessibility Statement
      • APAC
      • APAC - Simplified Chinese
      • APAC - Traditional Chinese
      • Brazil
      • Canada
      • Czech
      • Denmark
      • Finland
      • France
      • Germany
      • India
      • Indonesia
      • Israel
      • Japan
      • Korea
      • Mexico
      • Middle East
      • Middle East - Arabic
      • Netherlands
      • Norway
      • Poland
      • Portugal
      • Russia
      • Slovakia
      • Spain
      • Sweden
      • United States
      • Vietnam

      My Services

      • All News Releases
      • PR Newswire Amplify™
      • Resources
      • Journalists
      • Data Privacy

      Do not sell or share my personal information:

      • Submit via Privacy@cision.com 
      • Call Privacy toll-free: 877-297-8921

      Contact PR Newswire

      Products

      About

      My Services
      • All News Releases
      • Customer Portal
      • Resources
      • Journalists
      +44 (0)20 7454 5110
      from 8 AM - 5:30 PM GMT
      • Terms of Use
      • Privacy Policy
      • Information Security Policy
      • Site Map
      • RSS
      • Cookie Settings
      Copyright © 2026 PR Newswire Europe Limited. All Rights Reserved. A Cision company.